During Installation of Termination Point

  • Up to four (4) NetLink Trust’s appointed contractors will be involved in the installation, which will take no more than four (4) hours per installation. During installation, NetLink Trust’s appointed contractors will determine the location of the Termination Point (TP) in the office in consultation with the tenant. NetLink Trust’s appointed contractors will then attempt to leverage existing points of ingress to install the fibre optic cable into the offices wherever possible. Where there is existing surface trunking or cable tray in the office, NetLink Trust will attempt to use it to install the optical fibre cable. If the trunking cannot be used, NetLink Trust will explore other alternatives such as a new trunking.

  • The fibre is terminated onto a Termination Point, which is a small box that is placed inside your office premises.

     